Abundant
supplies of
electric power,
virtually
unlimited
capacities of
natural gas, and
plentiful
municipal fresh
water are all
readily
available.
Telecommunications
systems offer
the most
advanced digital
and fiber-optic
network to the
business
community.
Water and
Sewage
The Greeneville
Water System
provides water
to nearly all of
Greene County.
The system draws
its water from
the Nolichucky
River. The water
treatment plant
has a 12 MGD
capacity with a
raw water
storage capacity
of 32 MG and a
finished water
storage of 7 MG.
Water and
Sewage Usage
Rates
Minimum
usage of water:
300 cubic
feet---$5.00
Rate after
minimum is:
4-10 hundred
cubic
feet---$1.40
11-20 hundred
cubic
feet---$1.20
21-40 hundred
cubic
feet---$1.05
41-150 hundred
cubic
feet---$0.92
150 hundred
cubic feet and
up---$0.80
Minimum usage of
sewer: 300 cubic
feet---$5.54
Rate after
minimum is per
hundred cubic
feet---$1.68
Outside rates
are an
additional 75%
Water Taps
3/4\"
Service---$600.00
1\"
Service---$675.00
2\"
Service---$450.00
plus
Larger
Service---time
and material
cost of meter
included
Sewer Taps
Residential
or small
commercial
building---$800.00
Services
requiring
1\"water
tap---$1,000.00
Services
requiring 2\"
water
tap---$1,200.00
Factories and
commercial
buildings 10,000
sq.ft. and
larger
First 10,000
sq.ft.---$1,000.00
Each additional
10,000 sq.ft. or
fraction
thereof---$200.00
Natural Gas
The Atmos
Energy provides
natural gas to
Greeneville and
Greene County.
Monthly
Industrial Gas
Bill
Rate 230: Firm
Gas Service
This rate
is for
industrial
customers
requiring firm
service and
using at least
135,000 CCF per
year.
Cost of Gas:
.2261 per CCF
Facility Charge:
$200.00 per
month
Rate 250:
Optional Gas
Service
This rate
is available to
customers using
at least 270,000
CCF per year and
maintaining an
alternate fuel
supply.
Cost of Gas:
1st 20,000 CCF=.0996
per CCF / next
48,000 CCF=.0671
per CCF
Facility Charge:
$280.00 per
month
Rate 240:
Demand/Commodity
Gas Service
This rate
is available to
customers using
at least 270,000
CCF per year
Cost of Gas:
1st 20,000 CCF=.0996
per CCF / next
48,000 CCF=.0671
per CCF
Demand Charge:
1.6293 per CCF
Facility Charge:
$280.00 per
month
Telecommunications
Embarq
offers high-tech
telecommunications
products and
services. The
most advanced
business
communications
systems are
available with
100 percent
digital lines,
video
teleconferencing,
and data
networking using
fiber optics to
assure clear and
rapid voice and
data
transmission.
Embarq is a
member of
ValleyNet, which
provides
virtually
unlimited data
and voice
transmission
capacity and
connects with
all major
long-distance
carriers and the
nationwide
fiber-optic
network.
Electricity
The
Greeneville
Light and Power
System obtains
its power from
the Tennessee
Valley
Authority. Rates
for this
reliable,
economical
source of power
are well below
national
averages.
Monthly
Residential
Electric Bills
Based on
1,000 Kilowatt
hours
Greeneville
Light and Power
average = $62.46
Monthly
Industrial
Electric Bills
Based on
1,000 kW &
400,000 kWh
Greeneville
Light & Power
average =
$21,353
Monthly
Industrial
Electric Bills
Based on
20,000 kW &
13,140,000 kWh
firm power
Greeneville
Light & Power
average =
$579,505
Note:
Greeneville
Light & Power
System also
offers power on
an interruptible
basis. These
rates provide
savings of up to
60% as compared
to rates for
100% firm power.
Savings depend
upon ratio of
interruptible
power to firm
power.